To set up data for subcontracting the manufacture of items

This functionality is specific for India.

Complete the following steps to set up the data for subcontracting the manufacture of items:

  • In the Items - General (tcibd0501m000) session, create a normal purchase item. Select the Subcontracted checkbox.
  • In the Items - Production (tiipd0101m000) session, Routing tab, select the Subcontracting with Material Flow checkbox.
  • In the BOM tab, click Bill of Material; the Bill of Material (tibom1110m000) session opens. Link the required material lines. Save and close the session.
  • In the Items - Costing (ticpr0107m000) session, calculate cost price for the item.