Bill of Material
The Bill of Material contains the component items of a manufactured item. Each BOM
line contains information about the position of the component item in the BOM,
the required quantity, and the expiry date of the component item.
A BOM shows relationships of components to the parent item one
level down.
A BOM shows relationships of components and sub-components on
multiple levels.
A multilevel BOM that does not list the levels of manufacture,
and lists a component only once for the total quantity used.
An item that can cause a bottleneck in a production process due
to a long or uncertain lead time.