This topic describes the differences between the Project Data
Management module in Infor LN and in Infor LN SP1 that are not already discussed in other Differences
topics.
The Use Extensions in Budget check box gets checked in the Projects (tppdm6100m000) session if the Use Extensions in Budget option in the appropriate menu of the Project Extensions (tpptc0510m000) session is selected.
The cost control settings in the Project - Cost Control Levels (tppdm6102m000) session
also change. All the check boxes for the extension related cost control levels
get checked in the session. You can select this option for projects
with status higher than Free and lesser than Closed.
The Template Number Group and Series can be selected for the
templates in the User Profiles (tppdm0101s000) session.