| Update E-item relationInfor LN If the Revision Controlled check box in the Items - General (tcibd0501m000) details session is selected, revisions can be present for an item. If a new revision
is created for an item, the Update Method E-Item Relation field in the Items - General (tcibd0501m000) details session determines how the engineering item relationship is changed.
In Infor LN, you can choose between the following options: Automatic If a new revision is created for the engineering item, the
exiting relationship between the engineering item and one or more standard
items or customized items continues. Manual LN does
not create a new relationship between the engineering item and one or more
customized items. The existing relationship remains valid.
Infor LN SP1 In Infor LN SP1, you cannot choose between Automatic and Manual anymore to update the engineering item relationship.
Instead, you can select one of the following options in the Update Method E-Item Relation field: Yes If a new revision is created during engineering, and a
relationship already exists between the engineering item and an item, the
existing (effective) revision number is removed and replaced by the new
revision number. Freeze If a new revision is created during engineering, and a
relationship already exists between the engineering item and an item, the
existing (effective) revision number stays the same, and is not changed. In other words, the revision number of the
new revision will not replace the existing revision number. Break If a new revision is created during engineering, and a
relationship already exists between the engineering item and an item, the
existing (effective) revision number is removed. The removed revision number is not replaced by the new revision number, which means that
no revision number is displayed anymore.
| |