Project Definition

This topic describes the remaining differences between Infor LN 10.2.1 and Infor LN 10.3 in Project Definition.

Modified sessions
  • Convert Contract Currency (tppdm6211m000)
    Infor LN 10.3 allows you to perform the currency conversion for a contract header only if the all the contract lines are converted.
  • The following fields are added in the session:

  • Copy Projects (tppdm7840m000)
    The Costing Breaks check box is added to the Copy Projects (tppdm7840m000) session. If the Costing Breaks check box is selected, you can copy the costing breaks:
    • From an existing project to a new project
    • From a template to a new project
    • From an existing project to a template project
    • From an existing project to another existing project
  • Contract Deliverables (tppdm7100m100) and Contract Deliverables Schedule (tppdm7100m200)
    The value in the Use Installation Group field is defaulted from the Project (tppdm6600m400) session, if a service order is generated in Project. The installation group links the contract deliverables to Service. Contract deliverables (that are serialized items) are automatically transferred to Service when shipped to the customer, only if the deliverables must be maintained in Service.