Creating/Setting up costing breaksCosting Breaks In Infor LN 10.3, for projects involving production or service of an item (such as depot repair service), the user is required to monitor costs at various levels. Costing breaks provide a flexible method to view the breakup of costs at various levels in a project WBS. You can use costing breaks to move the costs from the top demand project pegs to other project WBS levels. You can also identify other specific cost types such as labor, material, subcontracting, and so on to redirect the costs to the other WBS levels. For more information, refer to Costing Breaks.
| |||