Using handling units in the shipment process
In FP7 the Shipment Line Handling Units (whinh4534m000) session is introduced. This session
allows you to link multiple handling units to one shipment line. For more information, refer to Using handling units in the shipment process.
Using handling units in the shipment process in
FP6
Only a single handling unit can be linked to a shipment
line.
The handling units that are generated during staging and
are linked to the shipment line, are always single-item handling units. When
multiple items (or multiple lots/serials of the same item) are shipped in one
shipment, multiple handling units are created, one for each shipment
line.
A virtual/dummy handling unit is created when multiple
handling units are merged into one shipment line during the pick process.
Therefore, the handling unit structure as stored in LN does not reflect the
actual physical structure.
Using handling units in the shipment process in
FP7
- During the pick and handling unit composition process, multiple
handling units can be linked to one shipment line.
- No dummy handling units are created.
- Composing handling units do not impact the administrative
structure of the shipment.
The following entities are added:
For more information, refer to Using handling units in the shipment process.