Material shortage checking

New in Infor LN FP6

In Infor LN FP6, you can perform a multilevel material shortage check. That is, if a material for a production order is supplied by another production order, this check also checks the material availability for that other production order.

An improved shortage report was introduced. To generate this shortage report, use the Print Material Shortages by Production Order (tisfc0419m000) session.

For more information, refer to Multilevel material shortage check.