Scheduling engineNew in Infor LN FP5 In BaanERP version 5.1a, an external Scheduling Engine was available to optimize the sequence of assembly orders on an assembly line. In version Infor LN FP5, the Sequence Engine has been reintroduced. In Infor LN FP5, you can optionally connect to the external Scheduling Engine, to optimize the sequence of assembly orders on the assembly line. For more information, refer to
| |||