Production order planning of generic itemsThe generic routing, defined in the Generic Item - Structure (tipcf3100m100) session, differs from the normal routing. Which operations are used in the routing, depends on the configuration. Example Two operations might be exclusive: either operation 10 is selected, or operation 20. As a result, a sequence of operations is not required. Therefore, the operation of a generic routing has several parameters for planning:
For the lead time, the planning percentage is taken into account. Operation lead time = planned production time * planning percentage The lead time offset is used to determine the start of the operation sequence. ![]() Planned production order for generic item
| |||