| Copying Master Plan to ItemsIn addition to copying
the various plan values, you can also modify these values by a certain
percentage. For example, you can raise the demand plan by 10% and lower the
inventory plan by 20%. Note LN only takes items into account for which the Maintain Master Plans check box in the Items - Planning (cprpd1100m000) session is selected. To copy plan data between items: - A master plan must
already exist for each target plan item and plan period involved. You can check
this in the Item Master Plan (cprmp2101m000) session. If such master plans do not exist
yet, you must first create them in the Initialize, Roll, and Update Scenario (cprpd4200m000) session.
- Specify the
scenario.
- Specify the source
item's plan level.
- Select the source
item.
- Select a range of plan
periods for which you want to copy the specified master plan data.
- Enter a percentage for
each plan type that you want to copy.
- Specify the target
item(s).
- Select the update mode
( Overwrite or Add To.
- Click Copy.
Note If the source and the
target plan items have different plan units, LN converts the planned
quantities to the plan unit of the target plan item. | |