Home
Control activity nodes
Control activity nodes
Use these procedures to manage Control activity nodes.
Side TOC
Side TOC
Control activity nodes
The Assign activity node
The Branch activity node
The Custom Activity node
The Return activity node
The SubProcess activity node
The System Command activity node
The Wait activity node
The Trigger activity node