Configuring the Branch node

  1. Drag a Branch node onto the Designer canvas.
  2. Connect it to the activity nodes that it branches to and from, and then right-click the node to open the Condition Expression Builder. If you right-click the Branch node before connecting to another node, the Condition Expression Builder does not open.
  3. Specify the information in the Condition Expression Builder.