To schedule a refresh or rebuild of the cube data on a recurring basis:
- Select AP Administrator > Utilities > Update Analytic Cube.
-
Select the Update Method.
-
Select Refresh to update existing cube data.
-
Select Reload to delete existing cubes and rebuild the data.
-
-
Click Schedule.
Use the following guidelines to specify field values:
- Scheduled Action Name
-
Specify a name, for example, Refresh Cube Data.
- Notify Recipient
-
-
Email Address: Specify the e-mail address of the person to whom notification of the scheduled action will be sent.
-
Notification Type: Select Never, On Failure, or Always.
-
- Scheduling Details
-
-
Schedule Type: Select from the list of schedule types.
-
First Time To Run: Select the first date and time to run the scheduled action.
-
Latest Time To Run: Select the last date and time to run the scheduled action.
-
Run Action Concurrently: Select Full Concurrency to run the action with other scheduled actions or No Concurrency to run the action on its own.
-
- Additional
-
-
Override Action Failure Configuration: Select this check box to override configuration if the action fails.
-
- Click Next.
-
Click Finish.
The cube data refreshes or reloads at the frequency and time specified.