Updating the Unit Cost of a Costed Item
- Open the Item Lot Locations form.
- Filter for the item for which you want to update unit cost.
-
On the Costs tab, specify amounts for
these fields:
- Material Cost
- Labor Cost
- Fix Ovhd Cost
- Var Ovhd Cost
- Outside Cost
- Save the record.
- The Total Unit Cost is updated.
Related topics