Updating the Unit Cost of a Costed Item

  1. Open the Item Lot Locations form.
  2. Filter for the item for which you want to update unit cost.
  3. On the Costs tab, specify amounts for these fields:
    • Material Cost
    • Labor Cost
    • Fix Ovhd Cost
    • Var Ovhd Cost
    • Outside Cost
  4. Save the record.
  5. The Total Unit Cost is updated.