General information
Provide the following general information to create a new scheduled task:
- A unique name to identify the scheduled task.
- From the Application Type drop-down list, select IRC or CM depending on the application to which the data is to be uploaded.
- The
Project Types drop-down list
is populated depending on the application type selected.
- If the application type selected is IRC, select whether the extraction will be script based or performed through the IRC Portable Data Extractor. The data extracted by the selected offline extraction project will be uploaded to the target IRC server.
- If the application type selected is CM, select Certification Manager Application Import.
- From the Project Name drop-down list, select the
required project name. The project names displayed in this drop-down list will
depend on the application type and the project type selected. For example, if
IRC is selected as the application type and IRC Portable Data Extractor is
selected as the project type, all the
IRC Portable Data Extractor projects
that are added to the IRC Portable Data Scheduler will be displayed in
the
Project Name drop-down list.
Note: Ensure that the project name selected here is not assigned to any other scheduled task. If the same project is used by two tasks, the data uploaded by the first task will be overwritten by the second task.
- From the IRC Server drop-down list, select the name of the server on which the target IRC or CM application is installed. The data is uploaded to the server specified in this field.
- Select the connection or
application through which data is uploaded to the target application server.
- If the application type
selected is IRC, the Connection drop-down list is displayed. All offline
connections in IRC are displayed in this drop-down list. Select the connection
through which data will be uploaded to IRC or select New Connection to create a
new connection for IRC. If you select the option to create a new connection,
provide the following details:
- Provide a unique name to identify the connection.
- From the ERP Type drop-down list, select the ERP for which the connection is being created. The data extracted from the selected ERP will be uploaded to the IRC server through this connection.
- If the application type selected is Certification Manager, The Data Source drop-down list is displayed. All data sources created in the target Certification Manager application are displayed in this drop-down list. Select the required data source through which the data will be uploaded to Certification Manager.
- If the application type
selected is IRC, the Connection drop-down list is displayed. All offline
connections in IRC are displayed in this drop-down list. Select the connection
through which data will be uploaded to IRC or select New Connection to create a
new connection for IRC. If you select the option to create a new connection,
provide the following details:
- In the Users to notify field, provide the email ID of the users to be notified. Email notifications will be sent to these users when a schedule is created, executed, successfully completed, stopped or failed.
- Click .