Creating POMs on the Measurements page of a style
- On the Point of Measure section, click Add New Row.
- Specify this information:
- Priority
-
Select a priority.
This list shows how each priority affects POMs:
- Critical and Default POMs are initially included on the measurement tab of a style together with mandatory POMs when the grade rule is added to a product, but they can be edited and removed.
- Mandatory POMs must be on every product that uses the grade rule and will be locked on the measurement tab. They cannot be removed from the grade rule.
- Optional POMs are editable and can be removed from the grade rule.
- Seq
- Specify the sequence number of the POM. Numbering is initially automatic upon creation, but you can freely update sequence number.
- Code
- Specify a code for the POM.
- Name
- Specify a name for the POM.
- Description
- Optionally, provide a description for the POM.
- Zero/TBD
- Select a display option for zero values on this POM. The options are Default, Confirmed Zero, and TBD.
- Status
- Select a status for the POM.
- Operational Status
- Select an operational status for the POM.
- Part
- Select a part for the POM.
- Tol+ & Tol - / Tol ±
- Specify a numeric value to indicate the tolerance level of the gradings. The number of tolerance columns depends on the tolerance format you select for the grade rule.
- Size
- Provide size values. The number of size columns displayed in the Grade Rule table depends on the size range that you specify in the grade rule details.