Status History tab

The Status History tab provides a chronological record of pipeline or step status updates, including timestamps and details for each change and launch configuration. You can change the number of records that the page shows.

This table shows the information in the Status History tab:

Pipeline information Description
Reported At Indicates the date and time when the status update was logged or reported in the system
Status Reflects the state of the pipeline or step at the given time stamp in Reported At
Details Show the technical details for each status update in JSON format

Each pipeline and each step within a pipeline has its own set of Status History values. The value shown for a pipeline execution differs from the value shown for an individual pipeline step.