Flow Switch
You can select this activity to split the control flow into three or more activities. A single activity runs based on a specified condition.
Note: Flow Switch is a Flowchart specific activity. This table lists the
properties for the activity.
Property Type | Property Name | Data Type | Description |
---|---|---|---|
Misc | Expression | Boolean/String/Int32/Object/Array of [T] | The condition based on which a single branch of the flowchart runs. |