Deployment
All the dependent packages must be deployed on the target tenant before proceeding with the global package deployment.
Prerequisite steps
A source tenant must be fully provisioned and operational. The user performing the operation must have Package Admin permissions. The target tenant (for import) must be provisioned and in a ready state. Security roles and user assignments should be configured on the source tenant before export.
Deployment process for editable packages
Initiate the Global Package operation (export, import, or validate) from the SSP/CSP UI. The system validates the package configuration and begins processing. Status progresses through: .
If errors occur, status moves to Error with a descriptive message.
For editable packages, you can review and modify resource mappings before importing to the target tenant.