Interpreting Enterprise Connector status

Use the Enterprise Connector status indicators to determine the health of Enterprise Connector and the Hybrid Service.

Status messages are color-coded to indicate the health of Enterprise Connector and the Hybrid Service.

Color Meaning
Green System is healthy. Modeling and runtime operations can continue.
Yellow A dependent component has an issue that can be resolved without stopping API processing.
Red Prerequisites are not met and modeling cannot continue.

Detailed status indicators

Enterprise Connector status Hybrid Service status Icon Meaning
EC OK HB: OK Green Enterprise Connector is running, the Hybrid Service is running, and the ION service is available.
EC OK HB: Pending Green Hybrid Service installation is pending.
EC OK HB: Unknown Green Hybrid Service is unavailable.
EC OK HB: Error / Not OK Red Hybrid Service is not running.
EC ERROR — Yellow Enterprise Connector is not running.
EC PENDING / EC NOT EXISTED — Red Enterprise Connector is not installed. Save the endpoint and suite to trigger automatic installation.
EC UNSUPPORTED / UNKNOWN — Red The Enterprise Connector version is too old. Upgrade Enterprise Connector.