Using the scheduler
To use the scheduler:
- Click the Scheduler tab.
-
Select one of the two options in the Data Load
Type field:
- All documents without incremental keys
- All documents selected in the Documents tab and that do not have incremental keys in the respective connection point are loaded.
- Incremental load
- All documents selected in the Documents tab and that do have incremental keys in the respective connection point.
The option that you select here becomes the default Run Frequency that is used when the load is manually started, unless otherwise configured at the time the operation is started.
-
Select between Basic and Advanced
Scheduling.
See Advanced scheduling options.