Flow Switch
You can select this activity to split the control flow into three or more activities. A single activity runs based on a specified condition.
Note: Flow Switch is a Flowchart specific activity.
This table lists the properties for the activity.
Property Type | Property Name | Description |
---|---|---|
Misc | Expression | The condition based on which a single branch of the flowchart runs. |