Adding lines with allowances
Use this procedure to create a line with a zero amount. The valuation is then calculated by drawing down the allowance.
Note: To use a line with allowances and draw downs, create the line with a zero value and set the Cost Option to Vendor Determined. The line must have an allowance defined for it before the contract is activated.