Contract Line Member

Analyze by Date:
- Effective Date
- Expiration Date
| Measure | Source and/or calculation |
|---|---|
| CLM Base Cost | BaseCost |
| CLM Net Cost Override | NetCostOverride |

Analyze by Date:
| Measure | Source and/or calculation |
|---|---|
| CLM Base Cost | BaseCost |
| CLM Net Cost Override | NetCostOverride |