Copying budget allocation lines
Use this procedure to create an allocation line from an existing allocation line or create a copy of an existing allocation line. You can copy allocation lines between allocations that exist in the same allocation control or in a different allocation control with the same budget basis and budget dimensions. Data from the copied allocation line are default values for the new allocation line.
- Select .
- On the Budgets tab, open an allocation control record.
- On the Allocation Lines tab, select the allocation line to copy.
- Click the button.
- Specify the New Allocation Line and the New Description.
- Click .