Contract Line Member
Analyze by Date:
- Effective Date
- Expiration Date
Measure | Source and/or calculation |
---|---|
CLM Base Cost | BaseCost |
CLM Net Cost Override | NetCostOverride |
Analyze by Date:
Measure | Source and/or calculation |
---|---|
CLM Base Cost | BaseCost |
CLM Net Cost Override | NetCostOverride |