Uploading an updated contract redline document through IDM

You can upload a newer version of a contract redline document to an existing contract record through IDM.
  1. Select an existing contract record that has a contract redline document.
  2. In the contract record page, select the Redline Document tab.
  3. Click the Open Redline Document link. The document opens in the IDM application.
  4. Click Check Out.
  5. Click Click here or drag n drop to add file and upload the document.
  6. Click Check In to save the changes.
  7. To view the previous versions of the document, select the History tab.