Voiding tasks

You can void a task for an open period if it is no longer required for that period. A task can be voided when it is in either a scheduled or an in process status. A voided task is visible for the period. A task that is voided in error can be reopened.

  1. Select Close Administrator > Close Setup > Manage Process.
  2. Click the View Schedule tab.
  3. Select the open period and select the corresponding scheduled task.
  4. Right-click the task and click Void Task.
  5. If a reason code is required for voiding a task, then select a reason code and optionally, add comments.
  6. Click OK.