Creating cost elements on the cost model details page

  1. In the Cost Elements section of the cost model details page, click Add
  2. Specify this information:
    Seq
    Specify the sequence number. The sequence number determines the order of cost elements used in a cost model. This field is automatically populated by the application, but you can modify the sequence by changing the sequence number for each cost element.
    QI
    Select to make the row as the request for quotation indicator. You can only select cost elements that are input types and not mapped to any BOM. When you add a cost model to a style, the quotation indicator is inherited.

    Any cost element that is marked with quotation indicator is included in a request for quotation.

    Type
    Shows the cost element type of the selected cost level.
    Cost Level
    Select a cost level. Cost levels are a generic lookup type and can be defined in Generic Lookup.
    Code
    Specify a code for the cost element
    Name
    Specify a name for the cost element.
    Description
    Optionally, provide a description for the cost element.
    Value
    Specify a value.
  3. Click Save or Save and Close.