General information

Use this section to create or review the basic information for the process.

Process Name
The name of the process.
Description
The description for the process.
Insight
The Insight for which the process is created.
Certification Type
The type of the certification process.

Possible values:

  • User/Role Review
  • Role/User Review
Make commit action mandatory for reviews
The mandatory option to commit the reviews.
Enable Closure Within a Specific Period
The number of days (greater than 15 and less than 365), from the process execution date, after which all the open reviews must be completed. Select the check box to specify the number of days. Possible values:
  • Approve and Commit All Pending Reviews
    Note: This option is selected by default.
  • Deny and Commit All Pending Reviews
  • Re-assign Reviews: You can select users to reassign the reviews.
Extend Closure Period By
The duration by which the closure period of the reviews are extended. Select the duration. Possible values:
  • 1 Week
  • 2 Weeks
  • 3 Weeks
Note: When editing an existing Certification Process with the Enable Closure Within a Specific Period option selected, you can edit only the specified number of days and the option to mark a review as completed. The modified value is applicable for the next occurrence of the review.
Data Source
The data source associated with the selected Insight.

The template name assigned for reviewing the process is displayed. The template is assigned based on the selected data source..

Process Owner
The owner of the certification process. The user creating the process is assigned the process owner role, by default. However, users assigned the IGRC-Certification Process Owner role can also be assigned as process owners.