Snapshot Schedule
Use this page to review the list of existing snapshot schedules.
You can review this information:
- Baseline Name
- The name of the Baseline.
- Category Name
- The name of the Baseline category.
- Enabled
- The number of enabled Baseline sub-categories.
- Total
- The total number of Baseline sub-categories.
- Insight
- The name of the Insight for which the Baseline category is created. The Baseline functionality currently supports the Process Insight for Infor.
- Application Instance
- The application instance associated with the Baseline category.
- Execution Date
- The date and time of the snapshot schedule.
- Created By
- The user name who created the Baseline category.
You can also use this page to:
- Create a new snapshot schedule, using the New option.
- Review or modify a snapshot schedule, using option.
- Delete a snapshot schedule, using the Delete option. You must select at least one schedule to perform this action.
- Download the information displayed in the grid to an excel sheet, using the Download Grid option.