Defining rate progression rules based on length of time rules
- Select Compensation > Set Up > Step and Grade Schedules > Rate Progression Rules.
- On the Rate Progression tab, click Create.
-
Specify this information:
- Rate Progression Rule and Description
-
Specify a long and short description for the rule.
- Version Date
-
Specify a version date.
- Currency
-
Select a currency for the rate progression.
- Active
-
Indicate whether the rate progression is active.
- Click Save.
-
On the Rules tab, select Create > Create Rule Based On Length of Time, and specify this information:
- Group
-
If applicable, select the eligibility group to which the rate progression applies.
Note:Eligibility groups, also called custom groups, must be defined by the administrator. See Infor HR Talent Set Up.
- Length of Time
-
Select a length of time rule or click Define to create a new rule. See Defining length of time rules.
- Waiting Period
-
If basing the rule on a waiting period, select the waiting period or click Define to create a new one. See Defining rate progression waiting periods.
- Allow Lump Sum Payments
-
Select this check box if lump sum payments are allowed after the employee reaches the top step for a grade.
- Pay Code
-
To link the lump sum payment to a pay code, specify it here. You can then place a pay code on the payment record for use when interfacing to a payroll application.
- Calculation Option
-
Select percent of base pay or flat amount to determine the way that the lump sum amount is calculated .
- Lump Sum Rate by Factor
-
Select if the lump sum is based on a performance rating or a step and grade schedule. If you select No, then everyone receives the same amount. This amount is specified in the Rate field.
- Lump Sum Rating Scale
-
If you selected By Performance Rating in the Lump Sum Rate Factor field, then you must select the rating scale by which the performance is rated.
- Rate
-
If you selected No in the Lump Sum Rate by Factor field, then specify the rate.
- Click Save.
-
If you selected By Grade On Step and Grade
Schedule in the Lump Sum
Rate By Factor field, then click the Lump Sum by Factor for Grades link.
To apply a lump sum to each grade, select the grade. Specify the amount or percentage to be applied to the last step of the grade.
-
If you selected By Performance
Rating in the Lump Sum Rate
Factor field, then click the Lump Sum by Factor for Performance link.
For each performance level where you want to apply a lump sum, select the performance level. Specify the amount or percentage to be applied to the last step of the grade.