Assigning a step and grade schedule to a position

Use this procedure to assign a step and grade schedule to a position. When you do this, resource work assignments that are assigned to the position are automatically assigned the position's step and grade schedule, if permitted by the position rules.

Note: The position pay rate type and currency must match the step and rate schedule pay rate type and currency .
  1. Select Compensation > Jobs And Positions > Positions.
  2. Open the position to which to assign a step and grade schedule.
  3. On the Compensation tab, specify this information:
    Schedule, Grade, Step
    Select the step and grade schedule to assign to this position

    You can only assign an active schedule to a position. An active version must exist as of the effective date of the work assignment.

    Grade
    Select the grade to assign to this position.
    Step
    Select the step to assign to this position.
  4. Click Save.
    The associated pay rate from the schedule version in effect as of the effective date is displayed on the position.