Checking in Multiple Objects

Note:  Click Refresh on any tab to ensure that you are viewing the latest records.

To check in multiple objects at once:

  1. Open the Mass Check In form.
  2. On each tab, specify the files to check in by selecting the Inc option for each row, or by clicking Select All.
  3. Optionally, to attach and check-in assembly images or symbols with an IDO extension class assembly:
    1. On the IDO Assemblies tab, select the row of the IDO extension class assembly.
    2. Click Assembly Image or Symbols.
    3. Specify the image or symbol file to attach.
    4. Click OK.
      Note:  After importing an assembly image, or symbol, on the Mass Check In form, the collection is saved automatically.
  4. Click Check In.
  5. If your source control application requires it, specify any additional required information, such as comments or tracking numbers.