Assignment List

Use this form to view the task details and assign resources. The supervisor name, resource group name, work center name and date are defaulted.

The form displays the task details such as item number, description, expected time line, start date/ time, resource assigned and operation status bar. If the task is for a PCS Project, the line provides details on the project number, activity, activity description and task description.

Note: Click on the task line to view Task Details form
  • Search: Use this field to search based on the order number, item number or item description.
  • Filter: Use this option to select the required Sort By or Filter By options to sort/filter based on your requirement.
    Note: A user with Supervisor role has the authorization to set user specific filters.
  • Assign: Use this option to assign or reassign resources to a task. You can assign or unassign the resources (operators or machines) to the task. Use the drag and drop capabilities to assign and unassign the resources.