Linking component items to end items

Use the As-Built Maintenance transaction to link serial-controlled or lot-controlled component items to end items. Linking these items helps to track, by serial or lot number, the components that are used to build items in a production order. You can link each end item serial number to the specific component serial or lot number that is used to build that end item.

  1. Select Production Transactions > As Built Maintenance. The As Built Maintenance screen is displayed.
  2. Specify this information:
    Item
    The number of the item that is built.
    Serial
    The scanned serial number of the item that is built.
    Order
    The order number of the scanned serial number.
    Component
    The component item number that is scanned.
  3. Click Submit.