Managing Resources
- Access the Resources form.
- Specify this information:
- Resource ID
- The code of the resource.
- Description
- The description of the resource.
- Resource Parent
- The parent resource to which the resource belongs.
- Description
- The description of the resource parent.
- Can Assign To Job(s)
- Select this check box to directly assign jobs to the resource.
- From ERP
- Indicates whether the resource is synchronized from the integrated ERP.
- Shifts
- The working shift of the resource.
- Status
- The operational status of the resource.
- Resource Type
-
The type of resource. Possible value:
- Labor
- Machine
- Other
- Work Area
- The work area of the resource.
- Using Machine Integration
- Select this check box to connect a resource to a machine through machine integration, for capturing the data automatically.
- Machine Server ID
- The machine server ID used for integration.
- Machine Channel
- The channel used to communicate with the machine server.
- Controller Folder Name
- The folder path of the controller who manages machine interface.
- Polling Interval
- The frequency at which the system polls the resource or machine for updates.
- Start From Integration
- Select this check box to start the job from machine integration.
- No Running Job Code
-
The downtime code that must be used when a machine is running without an identified job.
Note: This field is displayed only if the Start From Integration check box is selected.
- Tag Regen Time Interval (Minutes)
- The interval in which the machine tags are regenerated, in minutes.
- Archive Tag Time Interval (Days)
- The interval in which the tags are archived.
- Last Regen
- The date and time when the tags were last regenerated.
- Last Archived
- The date and time when the tags were last archived.
- Select the Activity and specify the Tag ID, Tag Name, and Tag Value.
- Click Save.