Resource Assignment by Resource Form

  • Use this form to view the tasks assigned to an Operator/Machine.
  • The form defaults the Supervisor name and the Operator/Machine for which resources must be assigned.
  • The form displays:
    • The Current Tasks and the Potential tasks assigned to the resources (operators and machines).
    • The task details such as the task name, the start date and time and the expected timeline
  • You can assign or unassign the tasks to the resources (operators or machines) assigned to the supervisor belonging to a work center.
Note: If the Exclude Rejects check box is selected for the Work Area transaction on the Parameter Dashboard form, the scrapped or rejected quantities are excluded when calculating the total quantity and the time to complete the task is also modified.