Stopping Job Operations for a Team
Use the End Team Run form to stop job operations for a team. You can use this
transaction to report completed and moved quantities, scrap items, and assign lot
and serial numbers when stopping job operations. To access the End Team Run form,
you must be assigned to the Administrator,
TeamLeader,or Supervisor permission group. To stop job operations for individual
employees, see Stopping Job Operations.
Note: The End Run Common
transaction is displayed which allows you to stop the job operations for a
single employee or team or workset, when you enable the feature (RS8558) check
box on the Feature Management form. See Stopping Job operations for a single Employee, Team or Workset.
To stop a job operation:
-
Open the End Team Run form.
Note: If the End Team Run form is started from the Home page, the form defaults the job fields for the employee. If no start record is found, the form displays the message: Employee: xxx does not have a run transaction running with an ok button. When the employee clicks the button, the form is closed.
- Optionally, specify a date and time to record for this transaction. The current date and time are specified by default. You can only modify the date and time if your user ID has the appropriate authorizations on the User Extensions form.
- Specify the team name or team badge ID.
- Specify a job and job suffix. The item number, unit of measure, warehouse, and job status are displayed along with the total, scrapped, completed, and remaining quantities. To view the current progress of each operation in the selected job, select the Progress tab.
- Select the operation number you are stopping. The work center where the operation will be performed is displayed along with the time the operation started and the elapsed time.
-
Specify or review this information:
- Good
- Specify the number of completed items for the selected operation.
- Moved
- Specify the number of completed items to move to the next operation. This value might be specified by default. If Time Track is implemented and this is the last operation on the order, this field is unavailable.
- Complete Operation
- If you are completing the operation, select this check box. This check box is only available if Allow Operation Complete is selected for this transaction.
- Close Job
- If you are completing the operation and it is the last operation on the job, select this check box. This check box is only available if Allow Close Job is selected for this transaction.
- Combine Labor and Machine Time
- Select this check box to report machine time as a ratio of labor time for this operation. Clear this check box to report machine time manually in a separate transaction. If the Time Track module in Infor Factory Track is implemented, this check box is only available if the Combine Labor and Machine Time check box is selected for your team on the Team Maintenance form.
- Machine Ratio
- This field is only displayed if Combine Labor and Machine Time is selected and if the Time Track module in Infor Factory Track is implemented. Specify a machine ratio. The machine ratio determines what portion of the reported labor time will be reported for the machine. For example, a ratio of .5 will report half the reported labor time for the machine. If the Time Track module is not implemented and the Combine Labor and Machine Time check box is selected, this field is unavailable and machine time will be reported as a one-to-one ratio to labor time.
- Resource ID
- Employees can select a resource ID for starting a labour transaction if the Combine Labor and Machine Time check box is selected.
- You can only view the resource ID field on start and end forms, if the Display Resource ID is selected.
- The resource ID displays resources that are in the resource groups on the Syteline job operations form's resource tab.
- Employee can only select resources associated with the job, if the parameter Only allow job resource is selected. However, employee can enter any valid resource if Only allow job resource is not selected.
- The Machine Resource field is displayed and the value is based on the validation of the resource ID field.
Note:- When a Team run is completed, the resource ID is included on the record for the first member of the team who started the run.
- The resource ID follows the same logic as that of recording the quantity.
- Location
- If applicable, specify the stock location where the completed items are to be received. This field is only available if the last operation of the job is selected and if the Put Away parameter is selected for this transaction.
- If applicable, use the Details tab to display operation related data. The tab displays the received quantity of the operation.
- If applicable, use the Scrap tab to scrap items. See Scrapping Items for details. This tab is only available if Allow Scrap is selected for this transaction.
- If applicable, specify the lot number on the Lot/Serial tab.
- If applicable, select the arrow button on the Lot/Serial tab to assign serial numbers. See Assigning Serial Numbers for details. You must assign all unassigned serial numbers to stop the operation.
- To stop the selected operation, select the green process button.
If you are creating a new lot, you might be prompted to specify lot attributes. If the Lot Attributes form is displayed, specify lot attributes. See Specifying Lot Attributes for details.Backflush Lots and Serials functionality is added. Also, an update is added to the posting logic to record all the quantities to the employee who performs the transaction instead of splitting across the team members. This logic is stable to deal with regular as well as serial controlled items and the update backflush data accordingly.