Configuring cross docking parameters
- Select Modules > Configuration > Infor CloudSuite Industrial Setup > Infor CloudSuite Industrial Cross Docking Parameters. The Infor Cloudsuite Industrial Cross Docking Parameters form is displayed.
-
Select a blank line from the
warehouse
list or click Create a New Object to configure new parameters for a warehouse
or requirement type,
Note: You can also slect the warehouse from the warehouse list to modify existing parameters for a warehouse or requirement type related to a warehouse.
-
Specify this information:
- Whse
- The warehouse for which the parameters are
configured.
Note: If you are configuring new parameters for a warehouse or requirement type, specify a warehouse. If you are modifying existing parameters for a requirement type related to a warehouse, the selected warehouse is displayed.
- Requirement Type
- The requirement type for which the
parameters are configured.
Note: If you are modifying existing parameters for a requirement type, the selected requirement type is displayed. If you are configuring new parameters for a requirement type, select a requirement type.Possible values:
- Jobs
- Sales Order Lines
- Transfer Order Lines
When transactions are performed, lines that match the selected requirement type are listed as possible options for cross docking.
- Priority
- Indicate the priority of the requirement
type.
Note: Priority can be specified using number, 1-99, Lower numbers have greater priority and higher numbers have lesser priority. When a line is selected for cross docking, requirement types with greater priority are listed first. If more than one requirement type shares the same priority, this is sorted by date and the most urgent orders are listed first.
-
Specify the number of days between 1-99
in the Future Days field.
Note: Only open and unreserved lines that are due before the specified number of days (counting from today), are listed as possible cross docking options.
- Click Save.