Recreating the OLAP database
After the dimensions have been imported into the Designer database, the changes must be pushed to
the OLAP database, by creating the dimensions
individually, or all at once by recreating the entire OLAP database.
After this is complete, some configuration steps must be completed in Infor d/EPM.
Cube data cannot be imported until the dimension structure that corresponds to that data exists in the OLAP database.