Hard disk space and type
Infor d/EPM usually requires 50 to
100 GB space on the hard disk for installation, Microsoft SQL Server, and for the OLAP
database central storage system. For the installation, and for some other tasks, the hard disk
performance is not relevant. For the production operation, the performance of the hard disk
storing the databases can have an impact.
Hard disk performance is relevant in these scenarios:
- Permanent logging during production operations.
- Auditing.
- Relational database storage.
Consider the use of high bandwidth SSD drives in these scenarios.