Viewing a pending or completed workflow
- Open the Workflows in Progress > Detail tab.
 - View this criteria. 
           
- Action Code
 - The actions in the action set. Each action represents a step in the workflow.
 - Completed By
 - The user who completed the task.
 - Completion Date
 - Date the task was completed.
 - Due Date
 - The adjusted date for completing the task. The value of 12:00:00 AM indicates that the task is not complete.
 - Dur
 - The duration of the task.
 - UOM
 - The duration of the task in terms of unit of measure. For example, the duration can be in days or hours.
 - Effort
 - The effort that is required to complete the action step. If the total effort is 9 days, then a value of 9 is displayed in this field. A value of days is displayed in the UOM field.
 - Fixed Date
 - 
              Identifies whether the Start Date and Due Date for the action were changed in the Gantt tab or the Launch Workflow dialog. The values are: 
              
None– The Start Date and Due Date fields were not changed.Due Date– The Due Date field was changed.Start Date– The Start Date field was changed.
 - Group Code
 - The group that is assigned to the action.
 - Instructions
 - The instructions for the user who is completing the action step.
 - Latest Due
 - Displays the latest date and time on which this step must finish, without causing a delay in the subsequent steps.
 - Latest Start
 - Displays the latest date and time on which this step must begin, without causing a delay in the subsequent steps.
 - Level
 - The hierarchical level of the steps. For example, there can be steps within other steps.
 - Line
 - Line number of the step in the action set.
 - Loop Line
 - The line in the action set that Optiva loops to. A value of 0 indicates that there is no looping.
 - Modified By
 - The user who modified the workflow.
 - Next Lines, Prior Lines
 - The Prior Line dependencies for actions control the Next Line entries. You must separate multiple line numbers with a semicolon (;).
 - Object Key
 - Key code of the target object for each action.
 - Optional
 - Specify whether you want to permit users to skip action steps in a workflow. This feature can be used for non-stage gate and stage gate action sets. This column is not relevant for Wizard action sets.
 - Original Due Date
 - Original date on which the action was scheduled to be completed.
 - Original Start Date
 - Original date on which the action was scheduled to be started.
 - Percent Complete
 - Optional. You can use this field to track the progress of an action step. Specify a numerical value between 0 and 100. A value of 100 means that the task is complete.
 - Queue Status
 - 
              
Status of the action:
- 0 - Not started
 - 1 - In process (Action is in the Pending Tasks grid)
 - 2 - Closed (Action is removed from the Pending Tasks grid)
 - 3 - Ignore
 
 - Reason Code
 - The reason code is selected by the user who completed the action.
 - Rcv Indicator
 - 
              
Response to Optiva:
- 0 - Nothing
 - 1 - Received
 - 2 - Returned
 - 3 - Rejected
 - 4 - Completed
 - 5 - Suspended
 - 6 - Skip
 
 - Risk
 - Risk assessment: Low, Medium, or High.
 - Role Code
 - Role that is assigned to the action.
 - Run Only Once
 - This column applies only to Wizard action sets. It indicates whether this action step can be run only once.
 - Source User
 - User who launched or processed this workflow step.
 - Start Date
 - The adjusted date for starting the task.
 - User Code
 - User who is assigned to the action.
 
 
This example shows the first 3 lines of details.