Setting up UOM for test intervals

Set up units of measure for test intervals. The interval is the time between the test runs. They are used to calculate the end dates for each iteration of a test.

  1. Open the Unit of Measure form.
  2. Select the Test Interval box to make it available in a lookup for test intervals.

    These are the test intervals.

  3. Specify the value for the System UOM. The internal system unit of measure is used to calculate the end dates for each test interval.
  4. See the Infor PLM for Process Application Configuration Guide.