Example of a UOM of time for test intervals

  1. Specify this information:
    System UOM
    Specify a System UOM that Optiva uses to calculate the dates of the tests. For more information about configuring tests, see the Infor PLM for Process Tests Administration Guide.
    Test Interval
    Select this check box to enable this UOM to be used as an interval between tests.
    UOM Type
    Specify a UOM Type that is for time.
  2. Click Save.