Defining NPD Items
These codes are used to associate newly designed items with a specific NPD project or program.
- Open the NPD Item Detail form.
- Select the required item on the Item field.
- Click the Main tab.
- In the NPD section, specify this information:
- NPD Id/Code
- The NPD project code for the item.
- NPD Assignee/Contact
-
The employee responsible for development of the item.
Note: The employees marked as engineers are displayed in the list.
- NPD Start Date
- The date on which NPD process for the item is started.
- NPD Due Date
- The date on which NPD process for the item is expected to be completed.
- NPD Complete Date
- The date on which NPD process for the item is completed.
- Include in NPD Metrics
- Select this check box to include the item for overall NPD metrics tracking.
- In the Drawing section, specify this information:
- BOM Placeholder
- Select this check box if the NPD item is a placeholder in the BOM, for another item.
- Placeholder Item
- The placeholder item that the NPD item is supposed to replace.
- NPD Drawing Number
- The drawing number associated with the item.
- Drawing Due Date
- The date on which drawing of the NPD item is expected to be completed.
- Drawing Complete Date
- The actual date on which drawing of the NPD item is completed.
- In the Cost Detail section, specify this information
- Target Cost
- The total expected cost for the item.
- Actual Cost
- The Unit Cost for the Item is displayed
- Variance
- Actual Cost – Target Cost value
- Variance %
- (Target Cost - Actual Cost) / Target Cost * 100
- In the Purchase section, specify this information:
- Vendor Sample Required
-
Select this check box if a sample is required for the item.
Note: This field is enabled only if the Source field is set to Purchase or the Make vs Buy check box is selected on the Items form.
- Sample Required By
- The date by which the sample is needed.
- Reference
- The reference type for how the sample is being procured.
- Reference Details
- The reference Id, line, and sequence details of the corresponding reference type.
- Sample Approved Date
- The date on which sample is approved after quality check.
- In the Manufacture section, specify this information:
- BOM Type
-
The type of BOM used for manufacturing an item.
Note: This field is enabled only if the Source field is set to Manufacture or the Make vs Buy check box is selected on the Items form.
- BOM Due Date
- The date on which the BOM is expected to be completed.
- BOM Complete Date
- The date on which the BOM is complete.
- Prototype Required
-
Select this check box if a prototype is required for this NPD item.
Note: This field is enabled only if the Source field is set to Manufacture or the Make vs Buy check box is selected on the Items form.
- Prototype Required By
- The date by which the prototype must be completed.
- Prototype Reference
- The manufacturing reference number of the prototype.
- Prototype Reference ID Details
- The job order number and suffix or the project resource.
- Prototype Approved Date
- The date on which prototype is approved.
- Click Save.
Note: You can define NPD details for an item only if, the Material Status field on the Items form is set to New.