Job Cost Variance Dashboard

Use this dashboard to provide a consolidated analytical view of job costing performance in Infor SyteLine. The dashboard compares planned costs with actual costs for material, labor and overhead components. The dashboard can be used to monitor cost efficiency and identify the variances at job, suffix, and item level.

These are the filters associated with this dashboard:

  • Site
  • Entity
  • Year
  • Year/Month
  • Warehouse
  • Manufacturing Type
  • Job Number
  • Operation Number
  • Job Order Status
  • Work Centre
  • Item

These columns are displayed in this dashboard:

Site
The location where the job is executed.
Job
The unique job identifier for the production order.
Suffix
The sub-level level detail of the job.
Job Date
The creation date of the job.
Item
The product or component associated with the job.
Operation
The operation number within the job where the material is used.
Planned Material Cost
The estimated material cost.
Actual Material Cost
The actual cost of material.
Planned Labor Cost
The estimated labor cost.
Actual Labor Cost
The actual cost of labor.
Planned Overhead Cost
The estimated overhead cost.
Actual Overhead Cost
The actual overhead cost.
Total Estimated Cost
The total estimated cost planned for the job.
Total Actual Cost
The actual total cost to complete the job.
Material Cost Variance
The difference amount of planned and actual material cost.
Labor Cost Variance
The difference amount of planned and actual labor cost.
Overhead Cost Variance
The difference amount of planned and actual overhead cost.
Total Cost Variance
The difference amount of total planned and total actual cost.