Job Material Details Dashboard
Use this dashboard to track the material-related job data. You can use this dashboard to identify material efficiency, control costs and variances in production and track planned and actual material usage, cost consumption, cost variance and material flow at the operation level.
The dashboard supports detailed analysis at the job, item, and operation levels.
These are the filters associated with this dashboard:
- Site
- Entity
- Year
- Year/Month
- Warehouse
- Manufacturing Type
- Material Type
- Material
- Job Number
- Job Order Status
- Work Center
- Product Code
- Item
These columns are displayed in this dashboard:
- Site
- The location where the job is executed.
- Job
- The unique job identifier for the production order.
- Suffix
- The sub-level level detail of the job.
- Job Date
- The creation date of the job.
- Item
- The product or component associated with the job.
- Operation
- The operation number within the job where the material is used.
- Sequence
- The sequence order of the job.
- Material
- The material required for the operation.
- Material Description
- The description of material.
- Units
- The unit quantity associated with the material transaction.
- Unit Of Measure
- The unit of Measure for material.
- Reference Type
- The source type of material transaction such as job, purchase order, or inventory.
- Reference Number
- The reference document number associated with material movement.
- Actual Material Quantity
- The actual quantity of consumed material.
- Planned Material Quantity
- The planned or expected quantity of required material.
- Actual Material Total Cost
- The total cost based on the actual material consumption.
- Planned Material Total Cost
- The total cost based on the planned material requirement.
- Material Variance
- The difference between actual and planned material cost.